Dec. 2 is the first formal day I re-worked in IRLab. There was a new machine and monitor assigned to me. I formatted the machine and installed all the software. It was fresh to me. As my IP was a new one, there were many problems when I visited the servers. Victor and Gc helped me a lot. Thanks to them.
After installing a new operating system, I could do many things. I cleared up all the materials and install many common softwares. I thought in this weekend I should prepare all pre-requirement environments. Then I can do my works in the next week.
没有评论:
发表评论